Core Insights - Chevron Corporation, along with partners Shell plc and NewMed Energy, has received approval for an updated development and production plan for the Aphrodite gas field, estimated to cost 4billion[1][5]−Theupdatedplanaimstoacceleratetechnicalandengineeringstages,leadingtofront−endengineeringanddesign(FEED)andaFinalInvestmentDecision(FID)[2]−TheAphroditegasfieldisexpectedtohaveamaximumproductioncapacityof800millioncubicfeetofgasperday,withinitialextractionthroughfourproducingwells[3]DevelopmentandProductionPlan−Theapproveddevelopmentplanincludestheconstructionofafloatingproductionunit(FPU)andsubseapipelinesforgasexporttoEgypt[2]−AnamendmenttotheProductionSharingContracthasbeensigned,committingtoreachanFIDforthegasfield′sdevelopmentby2027[4]EconomicandRegionalImpact−Thetotalprojectcostof4 billion includes FEED and pre-FEED studies, which are essential for determining the feasibility of reaching an FID [5] - The development of the Aphrodite gas field is expected to benefit both the national and eastern Mediterranean regions, aligning with Chevron's strategy for greener energy [6] Project Timeline - Production from the Aphrodite gas field is estimated to begin in 2031, located approximately 160 km south of Limassol at a water depth of 1,700 meters [7]