Core Viewpoint - The successful completion of the signal equipment renovation project at Zhuolu Station marks a new chapter in the intelligent operation and maintenance of the Daqin Railway, enhancing safety and efficiency in coal transportation [1] Group 1: Project Overview - The Daqin Railway is China's first double-track electrified heavy-haul railway, serving as a crucial energy corridor connecting Shanxi, Shaanxi, and the western Inner Mongolia coal region to the Bohai Bay port [1] - The railway accounts for approximately 20% of the national coal transportation volume, with an average of 52.7 trains carrying 20,000 tons of coal daily [1] Group 2: Engineering Details - The signal equipment renovation project primarily involved five stations: Datong, Yangyuan, Zhuolu, Shacheng East, and Beixinbao, with the renovation of Zhuolu Station and its adjacent signal equipment covering a total length of 51.05 kilometers, of which 6% consists of bridges and tunnels [1] Group 3: Impact on Operations - The completion of the signal equipment renovation project significantly improves the safety and efficiency of railway operations, ensuring smooth transportation along the "West Coal East Transport" corridor [1]
大秦铁路涿鹿车站及区间信号设备大修工程顺利完成