Workflow
助力德国能源转型!海博思创独立储能项目展风采

Core Insights - The King Lake Independent Energy Storage Project by Haibosichuang has made significant progress, attracting widespread attention in the German energy storage industry since its inception [1] - The project aims to optimize local electricity distribution and enhance energy efficiency, providing a solid guarantee for the stable operation of the regional power system [1] Project Overview - The project was officially initiated in July 2024, with equipment arriving at the site in December 2024 and installation completed by February 2025, currently in trial operation [3] - The project has a scale of 10.35MW/22.36MWh and is equipped with the Haibosichuang HyperBlock II liquid cooling energy storage system, which boasts high maturity, safety, low Levelized Cost of Storage (LCOS), long lifespan, and strong environmental adaptability [3] - The system includes advanced fire safety measures and is supported by the Haibosichuang AI cloud platform for automatic inspection and remote operation, ensuring safe and stable operation of the energy storage station [3] Client and Market Position - The client, SF, is one of the largest electricity traders in the German market, chosen Haibosichuang for its comprehensive advantages, including extensive industry experience, leading market position, and high-quality production capabilities [5] - Haibosichuang's team has demonstrated rapid and professional responses to client needs, supported by a local operations team in Germany providing 24/7 service [6] Market Impact - As an independent energy storage station, the King Lake project will participate in local primary and secondary frequency regulation services and electricity market trading, playing a crucial role in stabilizing regional power supply and enhancing energy utilization efficiency [8] - The project is expected to significantly contribute to the German energy market and support local energy transition and sustainable development [8]