Workflow
GFG Announces Encouraging Phase 1 Drill Results from Pen Gold Project, Ontario
GlobeNewswire·2025-06-02 10:23

Gold and base metals mineralization intersected at multiple targets; exploration budget increased to support aggressive H2 programKEY HIGHLIGHTS: Chabot Target: 3.90 grams of gold per tonne (“g/t Au”) over 3.5 metres (“m”), including 9.62 g/t Au over 1 m near surface (PEN-25-100); second zone returned 2.6 g/t Au over 1.3 m with over 1% zinc (1).Alpha Target (Muskego North Shear Zone): 1.00 g/t Au over 1.0 m (MSK-25-004), confirming the down-dip extension of a 2022 bedrock sample that graded 5.18 g/t Au.Foxt ...